Chart Industries called upon P1 Group as a trusted ESP (Engineered Systems Partner) to do the LN2 (liquid nitrogen) installation/replacement at Aisin Light Metals.
All trades under one roof: P1 Group put virtual design and construction, fabrication, and mechanical, electrical, plumbing, and technologies construction (MEPT) capabilities to work on this project.
P1 Group worked on 90K sq. ft. of new construction and 18K sq. ft. of renovated space at Saint Luke’s South, installing four air handling units, 59K feet of piping and 956 valves, 353 plumbing fixtures, and 109K pounds of sheet metal (94K fabricated by P1).
Liberty Hospital needed a mechanical cooling solution that would allow them to operate their towers during cold weather without using a continual drain-and-refill method.
P1 Group installed 21 rooftop air handling units, 6 energy recovery ventilators (ERVs), 550 linear feet of trench drain, and 13 hose reels at the new $7.5 million Lawrence Humane Society facility.
The mighty Circa Resort and Casino, the first ground-up resort built in downtown Las Vegas since 1980, was a challenge for the P1 Las Vegas team. But even during a pandemic, there was no work stoppage throughout the entire 22-month project completion period.
When the Dwight D. Eisenhower VA Medical Center in Leavenworth, KS needed a medical gas trailer to equip their mobile operating room (OR), P1 Group stepped up to the challenge.
After a year of the COVID-19 communicable virus, public areas got closer scrutiny in terms of safety. When the University received CARES Act funding, one of the projects they decided upon was replacing faucets and flush valves with touchless fixtures in public spaces.
The University of Kansas Health System Cambridge Tower
Working on new construction around an active hospital is challenging enough, but the University of Kansas Health System (TUKHS) Cambridge Cancer Treatment Center project added multiple floors to the mix.
Ft. Riley’s new Irwin Army Community Hospital was the largest single government contract underway at the time and was deemed a “statement facility” for Ft. Riley and the Federal Government.
Retrofit projects like the Research Medical Center/Brookside Central Plant in Kansas City can be challenging, but thanks to P1 Group’s Virtual Design Construction (VDC) and fabrication capabilities...
What do you do when your 500-ton capacity silo needs to be modified from a tapered, oval shape to “true round”? This is exactly the type of challenge P1 Group Millwrights are highly trained to solve.
P1 Group completed the University of Kansas School of Business in 2016. The main building is four stories with classrooms, an administration area and...