Skip to main content

We're Hiring - Join the P1 team   Careers

Saint Luke's Chilled Water System

Saint Luke's Hospital Energy Center Chilled water system, designed for high efficiency, was not meeting performance expectations.

P1 Group was asked to provide a two-year simple payback solution that would integrate with the existing building automation system for measurement and verification. P1 Group implemented a highly sophisticated chilled water optimization platform with advanced software control algorithms to improve the Energy Center systems performance. In a holistic approach to achieve optimal control and peak efficiency, P1 Group also enhanced the operation of the building’s HVAC systems through commissioning services.

"The improved chilled water optimization system has not only significantly decreased our energy usage, the re-designed platform is also much simpler to moniter and control." - David Jones, System Director of Facilities Operations, Saint Luke's Healthcare System

Services Provided

  • Design review

  • Benchmark

  • Energy audit

  • Provide engineered solution

Quick Facts

  • Utility spend reduced more than 29%

  • Energy Center now operates above typical chilled water systems

Project Details

Location

Kansas City, MO

Chilled Water System

8,200 Tons

construction services icon
Work with Our Construction and Fabrication Experts

Need a team of professional specialty contractors to help with your next construction project? Get started by finding a P1 Construction location near you.

project portfolio icon
View More Construction Projects

Still not sure if P1 Construction, LLC is the right fit? Feel free to check out more examples of our past work and hear from our statisfied customers.