KSU Olathe
Just two years after opening its doors, K-State Olathe's high efficiency system was not performing optimally.
P1 Group implemented measures to address poor building environmental controls, improve system efficiency, and correct design and construction issues. Automated controls now allow setback and scheduling for occupancy. Through our commissioning process, substantial energy savings were discovered. In total, KSU Olathe's annual utility spend has been reduced by over 35%.
Services Provided
-
Design Review
-
Retro-Commissioning
-
Resolve Outstanding Issues
Quick Facts
-
Electric Consumption Down by 12%
-
Annual Gas Consumption Reduced by 48%
Project Details
Olathe, KS
108,000