Saint Luke’s Flex Capacity
Lee’s Summit, MO
PROJECT DETAILS
LOCATION:
Lee’s Summit, MO
COMPLETION:
May, 2021
SERVICES PROVIDED:
VDC/BIM; Mechanical, Electrical, and Plumbing Construction; Building Technologies; Fabrication
All trades under one roof: P1 Group put virtual design and construction, fabrication, and mechanical, electrical, plumbing, and technologies construction (MEPT) capabilities to work on this project. Across all trades, P1 had anywhere from 22-26 employees on site each day.
The SLE Expansion project addressed the hospital’s need for growth by expanding the emergency department. It included a small renovation of the ER waiting room, but the bulk of the job was the construction of additional ER patient rooms.
P1 Group installed a new air handling unit, including the associated duct work, zones, controls, heating hot water to support the new Variable Air Volume (VAV) control boxes zones; new underground plumbing and plumbing fixtures to support the new emergency department exam rooms, and new medical gas for each patient room; transformer and generator replacements, and state-of-the-art lighting for the helipad; temporary ambulance bay setups, relocation of existing operational fire alarm panels, re-routing of existing outside fiber infrastructure; fabrication of all ductwork and hangers, with some piping, and electrical; 3D modeling for all piping.
QUICK FACTS
- OWNER: Saint Luke’s Health System
- GC: McCownGordon