Olathe Health - Neonatal Intensive Care Unit (NICU)

Olathe, KS

PROJECT DETAILS

OWNER:
Olathe Health Systems

GENERAL CONTRACTOR:
JE Dunn Construction Co.

ARCHITECT:
HMN Architects

ENGINEER:
Brack & Associates

DURATION:
28 Months

SQUARE FEET:
40,000

SERVICES PROVIDED:
Mechanical Construction, Fabrication - Piping and Plumbing, Virtual Design Construction

P1 Group’s multi-process approach included the use of field iPads, prefabricated hangers and the Enterprise/Accubid estimating system to help the project run more efficiently.

P1 Group completed the sheet metal, mechanical and plumbing work for the Obstetrics and Neonatal Intensive Care Unit (NICU) at Olathe Medical Center (OMC). The NICU is located within a newly constructed, four-story wing on the northeast side of the hospital. We successfully rolled out several processes on this project, including:

  • The implementation of field iPads and new electronic document management procedures.
  • Prefabricated hangers, built in shop and sent to the jobsite installed.
  • The utilization of the Enterprise/Accubid estimating program.

On this project, we worked to take down parts of the existing medical gas system at OMC during the “Umbilical Phase” of the project in order to connect the new building structure to the old. This project was run during night shifts in order to maintain operational status during business hours, which made the outage much shorter - lasting for a few hours instead of days.

"Your team understood the important nature of this work and were quick and careful.” - John Luthi Construction Project Manager, Olathe Health

QUICK FACTS

  • 1 RTU and 5 AHUs were installed
  • All piping larger than 4” was welded; no grooved fitting were allowed
  • 9 iPads were purchased for field employees
  • 304 plumbing fixtures were installed on the project

Healthcare Projects

Olathe NICU
Healthcare

Olathe Health - Neonatal Intensive Care Unit (NICU)

P1 Group completed the sheet metal, mechanical and plumbing work for the Obstetrics and Neonatal Intensive Care Unit...

St Luke's Data Center
Healthcare

Saint Luke's Health System

CHILLED WATER OPTIMIZATION PROJECT - The Saint Luke’s Hospital Energy Center chilled water system went...

OPRMC
Healthcare

Overland Park Regional Medical Center

The Overland Park Regional Medical Center Bed Tower Expansion and Renovation project consisted of a new...

Office Network

Kansas City: (913) 529-5000
Lawrence, KS: (785) 843-2910
Topeka, KS: (785) 235-5331
Wichita, KS: (316) 267-3256
St. Joseph, MO: (816) 233-3305
Las Vegas, NV: (702) 270-4432
facebook icon linkedin icon twitter icon 24 7 service icon

All Content © 2018 P1 Group, Inc.

Web Design by Chad Wagner Design
in collaboration with Igniting Business