T-Mobile Aspiria Campus
Overland Park, KS
PROJECT DETAILS
LOCATION:
Overland Park, KS
GC:
AL Huber
P1 Building Technologies put their capabilities to work on four newly renovated office buildings at the T-Mobile-Aspiria Campus (formerly Sprint).
STRUCTURED CABLING
Installation of a Panduit Structured Cabling with 4,000+ Category 6A data cables and 20,000 ft. of fiber optic cable; 4,000 fiber terminations; 400+ wireless access points
SECURITY
Installation of Access Control system with 400+ doors combined; 250 AXIS IP cameras managed by a American Dynamics video server
AUDIO/VISUAL
400+ conference rooms with 55” to 75” monitors; Cisco video conferencing connectivity; room schedulers and occupancy sensors
QUICK FACTS
- 600,000 + sq. ft. combined office space
- Video, digital signage, sound systems in common and training areas
- Large video wall application with control systems to manage their Network Operation Center