P1 Group completed all sheet metal and plumbing work for the immense Amazon MKC4 distribution center.

The Amazon MKC4 is a massive distribution center. It is a non-sort Amazon facility, for large items that employees move with forklifts to get them ready to ship. P1 Group completed all of the sheet metal and plumbing. The HVAC system includes 55 rooftop units- lifted to the top of the building with helicopters and 6,000 linear feet of natural gas piping.

Commercial Projects

Garmin - New Warehouse Facility
Commercial

Garmin - New Warehouse Facility

P1 Group completed this project for Garmin in 12 months rather than the anticipated 18 months...

CenturyLink Corporate Office Consolidation
Commercial

CenturyLink Corporate Office Consolidation

P1 Group reduced the hoisting timeline by days with the use of an air crane instead of a traditional crawler crane.

The Merc Co-Op
Commercial

The Merc Co+Op

The Merc had been moving toward reducing their carbon footprint and becoming more environmentally aware and sustainable. They made...

Amazon Fulfillment Center MKC4
Commercial

Amazon Fulfillment Center MKC4

The Amazon MKC4 is a massive distribution center. It is a non-sort Amazon facility, for large items that employees...

Office Network

Kansas City: (913) 529-5000
Lawrence, KS: (785) 843-2910
Topeka, KS: (785) 235-5331
Wichita, KS: (316) 267-3256
St. Joseph, MO: (816) 233-3305
Las Vegas, NV: (702) 270-4432
facebook icon linkedin icon twitter icon 24 7 service icon

All Content © 2018 P1 Group, Inc.

Web Design by Chad Wagner Design
in collaboration with Igniting Business