The University of Kansas Health System Cambridge Tower
Kansas City, KS
PROJECT DETAILS
COMPLETION:
Projected: December, 2021
SERVICES PROVIDED:
VDC/BIM; Detailing/Coordination; Building Technologies; Electrical Construction; Electrical Fabrication
LOCATION:
Kansas City, KS
OWNER:
The University of Kansas Health System
GC: JE Dunn Construction
Working on new construction around an active hospital is challenging enough, but the University of Kansas Health System (TUKHS) Cambridge Cancer Treatment Center project added multiple floors to the mix.
P1 Group had to create a high level of efficiency across capabilities. As usual, the team was ready for the challenge with innovations in fabrication, virtual design, and inventory management that have helped this impressive electrical project run smoothly.
Of note are the custom conduit rack rolling carts P1’s electrical fabrication shop developed to fit in the elevators, which allowed for a smoother conduit rack install on the multiple floors. The shop also fabricated all of the branch conduit racks for the 10th, 9th, and 8th floors of the building.