Wolf Creek - Water Hammer Mitigation Modification

Burlington, KS

PROJECT DETAILS

LOCATION:
Burlington, KS

DURATION:
62 days

SCOPES OF SERVICES:
Welding-Nuclear Certified, Pipefitters, Electrical-Qualified Technicians, HVAC Service Technicians, Planning- Electrical, Mechanical and Welding, Project Mangers/Coordinator

P1 Group’s single-source capabilities made us the preferred provider to complete a variety of service scopes in a short amount of time for Wolf Creek.

As a single source solutions provider, P1 Group’s top priority is to provide support to customers in whatever capacity they may need. When Wolf Creek Nuclear Operating Corporation (WCNOC) came to our team with a request to perform the Essential Service Water (ESW) Water Hammer Modification with very little preparation time, we didn’t hesitate to step in and complete the project. In a matter of days, P1 Group was able to secure an additional 25 certified welders to augment current staffing. The increased support enabled us to finish the ESW Above Ground project plus expanded Water Hammer scope within the initial time parameter.

In total, P1 Group installed approximately 700’ of 24” pipe and 40’ of 3” and 8” pipe with more than 570 welds for the Water Hammer Modification. The hard work and dedication of P1 Group was an instrumental part in the successful completion of Refuel 20.

KEY DIFFERENTIATORS

  • NQA-1 Complaint-Procedures, manual and organization structure are complete
  • ASME "U" and "S" Stamp
  • In-house training program NANTeL and Technical
  • Experienced personnel and management team, with extensive background in the execution of nuclear projects
  • Fabrication shops- pipe, plumbing, sheet metal, electrical

Nuclear Projects

Cooper
Nuclear

Cooper Extraction Steam Pipe Replacement

During Refuel 28, P1 Group fabricated all pipe spools in the Lawrence fabrication shop prior to installation during...

Wolf Creek ESW APGRP
Nuclear

Wolf Creeek EWS/CAC Replacement Project

Performing work in the nuclear industry comes with the expectation of delivering the highest quality product in the...

WC Water Hammer Mitigation Modification
Nuclear

Wolf Creek - Water Hammer Mitigation Modification

As a single source solutions provider, P1 Group’s top priority is to provide support to customers in whatever capacity they may...

Our Office Network

Kansas City

13605 W 96th Terrace, Ste 200
Lenexa, KS 66215
(913) 529-5000

Omaha, NE

14135 S 220th St, Ste 5
Gretna, NE 68028
(402) 401-4676

St. Joseph, MO

3815 Faraon Street, Ste A
St. Joseph, MO 64506
(816) 233-3305

Las Vegas, NV

5685 Cameron Street
Las Vegas, NV 89118
(702) 270-4432

Lawrence, KS

2151 Haskell Ave, Bldg 1
Lawrence, KS 66046
(785) 843-2910

Architectural Metal

8701 Elmwood Ave, Ste 500
Kansas City, MO 64132
(816) 708-0419

Manhattan, KS

301 S 4th Street, Ste 110
Manhattan, KS 66502
(785) 236-7350

P1 Group works with P1 Service, LLC to provide HVAC, mechanical, electrical, and plumbing service, performance solutions, and preventative maintenance. P1 Service, LLC has locations in Lenexa, KS, Wichita, KS, Topeka, KS, St. Joseph, MO, and Ankeny, IA.

Employees & Customers

All Content © 2018 - 2022 P1 Group, Inc.
Web Design by Chad Wagner Design in collaboration with Igniting Business