Wolf Creek ESW/CAC Replacement Project
Burlington, KS
PROJECT DETAILS
- 3,800 total QC hold point with zero missed hold points
- 24 cooling coils replaced
- 500+ feet of ESW pipe replaced
- 32 project days with a manpower peak of 87
There were 3,800 total QC hold points on this perilous project and P1 Group finished with zero missed hold points.
Performing work in the nuclear industry comes with the expectation of delivering the highest quality product in the safest environment possible. P1 Group has risen to that challenge by adhering to in-depth quality control standards in order to provide customers with the best possible solutions.
P1 Group put our skills to the test in completing two large portions of the Essential Service Water (ESW) and Containment Area Cooler Replacement Project for Refuel 22 at Wolf Creek Generating Station.
The two-fold scope of this project included replacement of twelve cooling coils and eight associated manifold header pipes on the CAC units. Additionally, P1 Group prefabricated piping assemblies before the refuel and the replacement of approximately 540 feet of ESW pipe.