Wolf Creek ESW/CAC Replacement Project

Burlington, KS

PROJECT DETAILS

- 3,800 total QC hold point with zero missed hold points

- 24 cooling coils replaced

- 500+ feet of ESW pipe replaced

- 32 project days with a manpower peak of 87

There were 3,800 total QC hold points on this perilous project and P1 Group finished with zero missed hold points.

Performing work in the nuclear industry comes with the expectation of delivering the highest quality product in the safest environment possible. P1 Group has risen to that challenge by adhering to in-depth quality control standards in order to provide customers with the best possible solutions.

P1 Group put our skills to the test in completing two large portions of the Essential Service Water (ESW) and Containment Area Cooler Replacement Project for Refuel 22 at Wolf Creek Generating Station.

The two-fold scope of this project included replacement of twelve cooling coils and eight associated manifold header pipes on the CAC units. Additionally, P1 Group prefabricated piping assemblies before the refuel and the replacement of approximately 540 feet of ESW pipe.

Nuclear Projects

Cooper
Nuclear

Cooper Extraction Steam Pipe Replacement

During Refuel 28, P1 Group fabricated all pipe spools in the Lawrence fabrication shop prior to installation during...

Wolf Creek ESW APGRP
Nuclear

Wolf Creeek EWS/CAC Replacement Project

Performing work in the nuclear industry comes with the expectation of delivering the highest quality product in the...

WC Water Hammer Mitigation Modification
Nuclear

Wolf Creek - Water Hammer Mitigation Modification

As a single source solutions provider, P1 Group’s top priority is to provide support to customers in whatever capacity they may...

Office Network

Kansas City: (913) 529-5000
Lawrence, KS: (785) 843-2910
Topeka, KS: (785) 235-5331
Wichita, KS: (316) 267-3256
St. Joseph, MO: (816) 233-3305
Las Vegas, NV: (702) 270-4432
facebook icon linkedin icon twitter icon 24 7 service icon

All Content © 2018 P1 Group, Inc.

Web Design by Chad Wagner Design
in collaboration with Igniting Business