P1 Group wins mechanical and plumbing project at Wright Memorial Hospital

TRENTON, Mo. – P1 Group, Inc. is proud to announce it has won another project with Saint Luke’s Health System – Wright Memorial Hospital.  The new 60,000-square-foot hospital is located in Trenton, Missouri and will feature 595 tons of roof top unit cooling and 255 plumbing fixtures.

The project marks the latest chapter of P1 Group’s long-standing relationship with Saint Luke’s that dates back more than 40 years.

The project will begin in late 2009 and is scheduled to be completed in December 2010.

Scope of Work

  • 595 tons of roof top unit cooling with self-contained steam generating humidifiers
  • Install (3) new 2000MBH hot water boilers with (2) 15HP hot water pumps
  • Install hot water piping to 156 constant/ variable volume reheat boxes
  • Install (7) APC in row split system cooling units for the data room units
  • Install a new medical gas system consisting of a new oxygen farm, vacuum pumps, medical air compressor, nitrous oxide, and nitrogen manifolds and distribution piping to 278 outlets
  • Install plumbing for 255 plumbing fixtures and a full kitchen
  • Install storm drainage piping
  • Install a natural gas piping and a new propane system for backup

 Congratulations to the following associates who were integral in securing this work for P1 Group:

  • Bill Frede, Preconstruction Manager
  • Jeff Peterson, Estimator

Wright Memorial Hospital is a 25-bed hospital with 38 registered nurses. It offers inpatient, outpatient, patient/family support, community outreach and imaging services.

Leave a Reply