P1 Group wins mechanical and plumbing project at Altus AFB

ALTUS, Okla. – P1 Group, Inc. is proud to announce it has won a HVAC and plumbing design-build project at Altus Air Force Base in Altus, Oklahoma. P1 Group will renovate 26,000 square feet of hospital space to reconfigure and modernize specific departments, including dental, optometry, mental health and radiology. These improvements will benefit outpatient, clinical, support and administrative functions.

The project is scheduled to be completed in August 2011.

Scope of Work

  • New air handling systems
  • Controls
  • Plumbing and medical gas
  • Commissioning

 Congratulations to the following associates who were integral in securing this work for P1 Group:

  • Pete McCall, Executive Vice President
  • Bill Frede, Preconstruction Manager
  • Ben Schrader, Project Manager

Altus Air Force Base was built in 1942 and is one of the U.S. Air Force’s premier air mobility training locations. The base features an average of more than 300 days of weather favorable to flying each year, in addition to having a flat landscape with few obstructions.

Leave a Reply