P1 Group wins HVAC design-build project at Lawrence Public Library

LAWRENCE, Kan. – P1 Group, Inc. is pleased to announce it has won a design-build project for Lawrence Public Library for HVAC equipment upgrades. In addition, P1 won a preventive maintenance service contract.

This project was awarded in April 2010 and is expected to be completed in August 2010.

Scope of Work

  • (2) 15-ton package RTUs with recovery wheels
  • Install direct digital control system
  • (1) chiller
  • (3) AHUs
  • (2) pumps
  • Air pressure balance and hydronic balance of entire building system
  • (4) VAV boxes to reduce energy consumption and increase indoor comfort

Congratulations to the following associates who were integral in securing this work for P1 Group:

  • Jim March, Vice President Service
  • Mitch Campbell, Division Manager
  • Ken Grose, Service Coordinator
  • Walter Doderer, Account Executive
  • Ken Erickson, Marketing Coordinator

Lawrence Public Library is a member of the Northeast Kansas Library System (NEKLS) and has more than 250,000 books and other materials. It also offers public computers, meeting rooms, instructional classes and art exhibits.

Leave a Reply