Tier 4 Data Center

P1 Group Services
  • Mechanical Construction
  • Electrical Construction
  • Controls
  • Building Technologies
Quick Facts
  • Tier 4 Data Center
  • 30 Static Transfer Switches
  • 4 Temporary PDUs
  • Dual input circuit breakers replaced with single input breakers
  • Kansas City, Missouri
Summary

P1 Group performed STS/PDU modifications to Building A while functioning as the general contractor, mechanical contractor and electrical contractor on the project. Since the data center is Tier 4, P1 executed mission critical work without interruption of service. In addition to installing temporary PDUs and backfeeds, modifying existing energized PDUs, and installing static transfer switches, P1 modified the existing chilled water piping under the computer room raised floor at three Computer Room Units. P1 also upgraded the existing control system and provided a new modbus network for monitoring of new STSs by the existing building control system.