Quick Facts
  • Four 800-amp Automatic Transfer Switches
  • 1,000 kw Diesel Generator
  • 6,000 gallon Fuel Tank
  • 1,100 ft. of Cable Tray
  • Lee’s Summit, Missouri
Summary

P1 Group replaced below-floor patch cables with a structured cabling design routed within ceiling-mounted cable trays, resulting in improved cooling efficiency and provided faster deployment of equipment and systems into production. P1 also fabricated and installed return air ducts onto the existing Computer Room Air Conditioning (CRAC) units, forcing the warmer return air through an above-ceiling air plenum instead of across the electronic equipment – improving the overall data center cooling efficiency by 10 to 12 degrees.