Siemens Wind Turbine Nacelle Production Facility

Siemens

P1 Group Services
  • Design-Build
  • HVAC Construction
  • Plumbing Construction
  • Sheet Metal Construction
  • Process Piping
Quick Facts
  • 25 Gas Fired RTUs with 325 Tons of Cooling
  • 40 Fan Powered VAV Boxes
  • 290 Grilles
  • 277 Plumbing Fixtures
Summary

P1 Group was responsible for the design-build mechanical services of this MEP project. In addition to the items highlighted to the left, P1 also installed 32 exhaust fans, 18 exhaust extractor arms, two sand/oil separators, a Transair aluminum piping compressed air system and gear oil, hydraulic oil, compressed air, glycol and process water systems. The new facility will be registered with the U.S. Green Building Council with a certification goal of LEED Silver.