Truman Medical Center

Truman-Medical-Center-Hospital-Hill

P1 Group Services
  • Commissioning
  • Retro-commissioning
Quick Facts
  • P1 Group rebuilt the five 100,000 CFM air handlers while keeping the facility fully functional
  • P1 was able to get additional capacity out of the owner’s equipment without having to replace it
  • This $4.5 million project was able to be funded by the energy savings over a 10-year period
  • Square Feet: 700,000
  • Kansas City, MO
Summary

P1 Group executed a full range of services to successfully solve the owner’s problem of the building being uncomfortable due to severe negative pressure. P1’s work served ORs, patient rooms and general hospital space.

  • Discovery — examined functionality performance of equipment and space utilization requirements
  • Corrective Action — consisted of conceptional design, design development and budgeting
  • Implementation — rebuilt five 100,000 CFM air handlers; added chilled water and condensed water pumps and a 560-ton chiller