St. Francis Hospital

St-Francis

P1 Group Services
  • HVAC Construction
  • Plumbing Construction
  • Sheet Metal Construction
Quick Facts
  • 1800-ton Chiller: 1
  • 400-hp Boilers: 2
  • VAV Boxes: 869
  • Underground Fuel/Oil Tank Capacity: 30,000 gallons
  • Square Feet: 432,000
  • Indianapolis, Indiana
Summary

P1 Group’s execution of the Acute Care Expansion project at St. Francis consisted of approximately 220 new patient beds, new emergency room, new wound care with hyperbaric chambers,  new operating suite with 10 ORs, new cafeteria, new Bariatric Unit and 17-bed Bone Marrow Transplant Unit.  The new addition required mechanical equipment additions to the central plant that included a new 1800-ton chiller, two cooling towers, two 400-hp boilers, a new deareator and a surge tank.