Fort Riley Southside Facilities

Photo courtesy BURNS & McDONNELL

P1 Group Services
  • Plumbing Construction
  • Mechanical Construction
  • Electrical Construction
  • Design-Build
  • Fabrication
  • Controls
  • Building Technologies
Quick Facts
  • Plumbing Fixtures: 220
  • Air Handling Units: 7
  • Condensing Boilers: 12
  • Chillers: 5 with 425 tons of cooling
  • Fort Riley, Kansas
Summary

This 18-month project consisted of two command buildings, three COFs and one hangar. P1 group used Victaulic (2 1/2” and up) and ProPress (2” and below) for 95% of all hydronic piping, ProPress for 95% of domestic water piping, and it used an Ingersoll Rand aluminum compressed air pipe system. P1 converted all duct to round and used Lindab “self sealing” gasketed spiral duct fittings. To make the project more efficient and safer, P1 Group fabricated and skid-mounted all pumps and boilers along with all interconnecting pipe, valves, strainers, etc. in the company’s fab shop in Lawrence and shipped the skids to the job site and set them in place for a “plug and play” application. Electrically, new electrical, special systems and temperature control wiring were installed for all buildings, and site lighting was added to all storage and parking lots.