Quick Facts
  • 4 ERV’s, 6 AHU’s
  • 12 Condensing Boilers, and 6 Condensing Units
  • 3 Chillers with 400 Tons of Cooling
  • 152 Plumbing Fixtures
  • Square Feet: 150,000 (6 Buildings)
  • Fort Riley, Kansas
Summary

P1 Group managed the construction and design for this six-building, MEP design-build project, which included three command buildings, two COFs and one hanger. The project featured four energy recovery ventilators, six air handling units, 12 condensing boilers and six condensing units. Moreover, three chillers with 400 tons of cooling were installed, along with 152 plumbing fixtures. In addition to doing all the electrical, special systems, temperature control wiring and site lighting, P1 Group also did the medium voltage distribution and outside plant (OSP) fiber and multipair copper cabling.