Black & Veatch World Headquarters

IMAG2305

P1 Group Services
  • Mechanical Construction
Quick Facts
  • Three new DOAS units (dedicated outside air units)
  • New geothermal well field
  • Two complete, custom-built AHU replacements
  • P1 BIM department led the coordination
Summary

P1 Group completed the mechanical work at the Black & Veatch World Headquarters, in extensive remodeling of two existing buildings and the construction of a new entrance. The HVAC design is innovative and uses 100% outside air, allowing the AHU’s to be smaller and more energy efficient.

P1 Group utilized the fabrication drawings as the permit drawings for the project, saving engineering costs and also creating efficiency by using the drawings for permitting, fabrication and installation.

Bill Frede, Pre-Construction Manager, and Chris Champagne, Operations Manager/Commercial Division, led the design and pre-construction team. Brian Maginness, Senior Project Manager at P1, was project manager; Vince Ley, Travis Pyles and Robb Eden were foremen.