Bass Pro Shops Corporate Headquarters

P1 Group Services
  • Mechanical Construction
  • Systems Analysis Study
  • Design-Build
  • Retro-Commissioning
  • Commissioning
Quick Facts
  • Springfield, Missouri
  • (2) VSD centrifugal chillers: 1,000 ton total
  • (2) VSD cooling towers: 80 hp total
  • (3) CW, (2) CHW pumps: 240 hp total
  • (2) Dual fuel flex tube boilers: 700 bhp total
  • (3) High efficiency condenser boilers: 180 bhp total
  • (5) Primary, (2) secondary pumps: 226 hp total
  • (1) DHW heat exchanger: 1,200 mbh
Summary

The Bass Pro Shops Corporate Headquarters project was a massive overhaul of the facility’s energy center that resulted in substantial utilities savings. The successful project resulted in an ASHRAE Technology Award. Following an in-depth study, retro-commissioning and design phase, P1 Group installed new high-efficient boilers and chillers, including complete system automation. In addition to Bass Pro’s operating savings, the outdoor retailer was able to enhance its “green” image and optimize use of natural resources.