Healthcare

More efficient by going paperless

To reduce inefficiencies and utilize new technologies, P1 is replacing stacks of paper drawings at many project sites with electronic plan documents that can be viewed on tablets in the field. P1 has also integrated our SharePoint project management system with Bluebeam, a PDF solution that is

Continue reading

P1 Group’s medical gas solution for expanding hospital

P1 Group Inc. is completing the mechanical, plumbing and sheet metal work for the new Obstetrics and Neonatal Intensive Care Unit (NICU) building at Olathe Medical Center. The  “Umbilical Phase” of the project – when the new building’s medical gas system was connected to the old building

Continue reading

Chilled water optimization project leads to big energy savings

Chilled water optimization project leads to big energy savings

KANSAS CITY, Mo. –  A chilled water system at The Saint Luke’s Hospital Energy Center went into operation in 2007 but was not meeting performance standards. Last year, Saint Luke’s and P1 Group did an extensive review of the system’s design, then completed an energy audit and

Continue reading

KC hospitals reap rewards with reduced energy consumption

KC hospitals reap rewards with reduced energy consumption

KANSAS CITY, Mo. – P1 Group’s Frank Tanner gave a talk “Reducing Energy Usage and Cost in Hospitals” at the February meeting of the Kansas City Association of Healthcare Engineers (KCAHE). Joining him in the presentation were KCP&L and Missouri Gas Energy (MGE) staff members, who encouraged

Continue reading

P1 wins work for new wing at Olathe Medical Center

P1 wins work for new wing at Olathe Medical Center

OLATHE, Kan. – P1 Group has been awarded the mechanical, plumbing and sheet metal work for a new Obstetrics and Neonatal Intensive Care Unit (NICU) at Olathe Medical Center. The Obstetrics and NICU will be located within a newly constructed, four-story wing on the northeast side of

Continue reading

Children’s Mercy Hospital Remodels Pershing Road Offices, Mechanical Work Awarded

KANSAS CITY, Mo. – P1 Group has won the mechanical work for the Children’s Mercy Hospital Pershing Road Offices.  This project includes a 22,500-square-foot remodel of the second floor. P1 Group was awarded this project in January 2014 and expects to complete it by May 2014. Scope

Continue reading

P1 Secures Plumbing Work for New Heartland Rehabilitation Hospital

OVERLAND PARK, Kan. – P1 Group has won the plumbing work for the Heartland Rehabilitation Hospital. The new two-story facility will be approximately 55,000 square feet and will serve Overland Park, the greater Kansas City metro area and the region. P1 Group was awarded this project in

Continue reading

Mechanical work awarded for Research Medical Center renovations

KANSAS CITY, Mo. – P1 Group has won a mechanical project for Research Medical Center. This project includes a 7,700-square-foot renovation of the Grossman Burn Unit located on the third floor. P1 Group was awarded this project in August 2013 and expects to complete it by the

Continue reading

Mechanical work awarded for Saint Luke’s East fifth floor expansion

Mechanical work awarded for Saint Luke’s East fifth floor expansion

LEE’S SUMMIT, Mo. – P1 Group has won a mechanical project for Saint Luke’s East Hospital. This project includes 60,000 square feet of shell space and a 35,000-square-foot tenant finish out of the fifth floor in the main hospital. P1 Group was awarded this project in August

Continue reading

Mechanical construction to begin on fifth floor of Saint Luke’s East Hospital

Mechanical construction to begin on fifth floor of Saint Luke’s East Hospital

LEE’S SUMMIT, Mo. – P1 Group has won a mechanical project for Saint Luke’s East Hospital. This project includes a 23,000-square-foot tenant finish out of the fifth floor in “Building F.” The shell space will consist of the Medical Oncology Unit, Appearance Renewal Center and Summit Gastroenterology.

Continue reading
Page 1 of 712345...Last »